Phone order · Two-storey extension, Derby

RB-41686

Invoiced
Furness Construction, builder, trade account at Band C. Phoned in by Amanda Moss on Mon 2 Nov at 12:51; keyed once by Josh during the 3 minute call. Yard collection for Tue 3 Nov to Two-storey extension, Derby. Owner Josh Kenyon.
Total, inc VAT
£1,139.98
£949.98 ex VAT + £190.00 VAT
Margin
21.7%
floor 12% a line
Furness Construction
Lines at Furness Construction’s own prices
Prices ex VAT: contract price first, then Band C; never under cost plus 12%
ex VAT
ProductQtyEachLineFrom
New 65mm Solid Red Clay Engineering Brick
NEB-RED65-380 · Pack of 380 bricks
3 packs
1,140 bricks
£316.66
Band C
£949.98
PO-3104 · 1,140
Net, ex VAT£949.98
VAT at 20%£190.00
Total£1,139.98
3 pallets on the collect. Every line clears the 12% margin floor.
Where each pack comes from
The lots it left the yard from, oldest stock first
Yard map →
1,140 bricks of New 65mm Solid Red Clay Engineering Brick
PO-3104 New, from Hollin Brickworks · delivered 18 Sep
Left3 Nov
Checked as it landed
price, stock and credit, before anyone touched it
£price
Priced at their rate
1 at Band C. Every line clears the 12% margin floor.
▦stock
Stock kept
Every line was available and kept for this order as it was keyed.
✓credit
Within the limit
Passed when it landed: inside the £2,500 limit.
As it arrived
Keyed once while the customer is on the line; card taken or put on account
Incoming call2 Nov 12:51
Amanda Moss, 01632 960352answered by Josh Kenyon
3 minute call. Keyed once while Amanda was on the line; each line priced and checked for stock as it was typed.
  • 3New 65mm Solid Red Clay Engineering Brick, pack of 380
How it was keyed
  1. 3 x New 65mm Solid Red Clay Engineering Brick, pack of 3803 x NEB-RED65-380
Keyed once while Amanda was on the line; nothing typed twice.
Delivery
CO
Yard collection
Yard collections
CollectTue 3 Nov
FromBrick yard gate, Clifton Works
Load3 pallets
Collected byA. Moss at 10:57
No slot to book
Yard collection: usually ready in 24 hours. The customer is texted when it is at the gate.
INV-53272Sent to Xeronot due yet
Dated3 Nov 2026
Due31 Dec 2026 (30 days end of month)
Total£1,139.98 inc VAT
Sent to Xero at 18:00 on 3 Nov from the delivered quantities. Nothing re-typed; Xero stays the ledger.
Customer
FC
Furness Construction
T-1037 · Builder · Derby
ContactAmanda Moss, site manager
Phone01632 960352
PricesBand C, 5% off list
Terms30 days end of month
Credit£1,140 of £2,500
Usually byWhatsApp
Short stockpart-ship and back-order
Timeline
Amanda phoned the order in; Josh keyed it once (3 min call)
Josh · 2 Nov 12:51
Priced at the Furness Construction account rates: 1 at Band C
Auto · 2 Nov 12:52
Stock kept for this order; the three stores show the new count
Auto · 2 Nov 12:52
Credit checked: within the £2,500 limit
Auto · 2 Nov 12:52
Collection on Tue 3 Nov; usually ready in 24 hours
Auto · 2 Nov 12:52
Picked by Kyle from PO-3104, checked by Gary
Yard · 2 Nov 13:36
Ready at the gate; customer texted
Auto · 2 Nov 13:56
Collected by A. Moss
Customer · 3 Nov 10:57
Invoice INV-53272 sent to Xero from the delivered quantities. Nothing re-typed
Auto · 3 Nov 18:00