Yard map · Wed 11 Nov, 10:42

Yard map

1,190 pallets in 52 bays, each tied to the lot it came from. Find a product and see which bays to send the forklift to.

Brick yard · Clifton Works
Rows A to F, 8 bays a row, 40 pallet spaces a bay
One pallet, in its brick colourPlannedFree spaceUnder 2 weeks2 to 8 weeks8 to 16 weeksOver 16 weeks, sell firstSwipe the map sideways for every bay
AHandmade
BHandmade · Pressed
CPressed
DEngineering · Wirecut
EPaving bricks · Setts, cladding
FKept for new lots
GateCollections
Picked orders wait here for the customer. Collection is usually ready in 24 hours; the yard is open Mon to Fri 8:00 to 16:00 and Sat 8:00 to 13:00.
Cleaning line and QCWhat goes into the bays next. Four cleaning stages and two QC stages, lot by lot.
  1. UnloadedOn the apron
    RL-0399HalifaxRL-0400Barnsley
  2. Clean 1Sort and stack
    RL-0398Chesterfield
  3. Clean 2Knock off old mortar
    RL-0397Penistone
  4. Clean 3Clean by hand
    RL-0396Mansfield
  5. Clean 4Final clean and band
    RL-0395Wakefield
  6. QC 1Frost, crack and spall check
    RL-0393Leeds
  7. QC 2Size, colour and face grading
    RL-0394ManchesterOn the stores about 15:00
  8. GradedWaiting for a bay
    RL-0391DoncasterRow F, Thu 08:00

Your own yard gets drawn from a walk round it, bay by bay.